Prepare the charger specification, quantity, and US destination before a factory is asked to quote.

Buyer desk

NovaAxis Supply

The buyer desk accepts one charging requirement at a time. Write the equipment lines in the form. There is no street address and no telephone published on this page, because the work email you enter is the reply path.

Illustration of a specification review table for a commercial charger inquiry

Where to send it

Use the form on this page. The modal from other pages posts to the same action, but this desk layout keeps the preparation steps beside the fields. Do not attach files. Name the datasheet or drawing you want the plant to return.

How a reply is addressed

Put a work email and a company name in the labeled fields. NovaAxis Supply answers that email after reading the requirement. A personal inbox without a company is a weaker match for a wholesale plant conversation.

What happens next

The review order is specification, quantity, US destination, and requested timing. Optional budget and supplier preference are read with those lines. A factory is contacted only when the brief is complete enough to repeat. Mark whether the date means factory release or arrival at the destination, and ask suppliers to separate production lead time from transit. A submitted target date does not confirm availability.

Lines worth repeating

For Level 2 EVSE or DC fast charging, mark the rated power in kW and whether it applies per port or per cabinet. Put input voltage and current on their own lines; NACS or CCS and the required OCPP version belong to the vehicle and network checks. Unresolved enclosure rating, sample availability or applicable listing evidence stays open for the proposed supplier and the buyer's reviewer.

  • AC or DC output and rated power in kW.
  • Input voltage, phase, and current.
  • Connector, such as NACS or CCS when that is the vehicle interface.
  • Network protocol, mounting configuration, and enclosure environment.
  • Quantity, unit, US destination, and requested delivery window.
  • Budget currency and whether the figure is per unit or the whole order.

High-end, mid-range, budget, or not yet decided is your preference. It does not grade a plant. A lower equipment-only budget may fit a buyer who already has cables, mounting and network services; an inclusive order budget must also cover those items and the agreed freight basis. Mark excluded costs rather than assuming they are free. If JavaScript is unavailable, type the budget and the preference into the requirement box. See the compatibility guide if a connector or protocol line is still unclear, or the manufacturer fields if you are aligning two replies. The procurement brief is the long version of this list.

NovaAxis Supply is an independent sourcing partner. Sending the form does not reserve equipment, does not approve an installation, and does not create a price. FREE sourcing support up to 3% remains the qualified-buyer notice already shown on the page, confirmed only after the product, quantity, destination, and sourcing requirement are reviewed.

Please enter your name.
Please enter a valid work email.
Please enter your company.
Please describe the procurement requirement.

Sending this form asks NovaAxis Supply, an independent sourcing partner, to review the requirement and contact possible charging-equipment plants. Read the Privacy Policy.