Fleet depot
Application. Vehicles return on a schedule and may need higher continuous load.
Interface questions. Port count, simultaneous kW, cable reach, and whether DC fast charging is actually required.
RFQ unit. Dispensers or pedestals per stall row.
Workplace parking
Application. Long dwell, often Level 2 EVSE, shared among assigned stalls.
Interface questions. Wall versus pedestal, access control, and load sharing across a garage panel.
RFQ unit. Ports, with the panel limit stated by the buyer.
Retail or hospitality
Application. Shorter public dwell and a higher chance of mixed connectors.
Interface questions. NACS and CCS availability, payment or network path, and enclosure rating outdoors.
RFQ unit. Dispenser islands, not a blended site lump.
Campus or municipal lot
Application. Many users, posted rules, and a need to separate equipment from civil work.
Interface questions. Mounting configuration, bollard scope, and who operates the network.
RFQ unit. Sites, then ports inside each site.
Charger beside other energy equipment
Application. A charging line shares a project with solar, storage, or a building service.
Interface questions. What the charger requires from the service, not a claim that the charger controls the other equipment.
RFQ unit. Charger line kept separate from modules, inverters, or batteries.